PMC - David Global Industries - Refurbishment Work

Total Project Management

Project Owner: David Global Industries
Location: Hamriyah Freezone, Phase 2, Sharjah
Main Contractor: Al Asfoor Technical
Project Management Consultant: Aromen Engineering and Project Management Consultancy LLC
Additional contractors: Midas Building Contracting, Midas Electromechanical Contracting
Consultant: Deyyar

Project Management for Building Refurbishment

The refurbishment of an old building involves a comprehensive project management approach to ensure that all aspects of the renovation are executed efficiently and effectively. This project entails several key components that require careful planning, coordination, and execution. Below is an elaboration on the various elements involved in the refurbishment process:



1. Replacement of Skylights

Replacing the complete skylights is crucial for enhancing natural light within the building. This process includes: - **Assessment of Existing Skylights**: Evaluating the condition of current skylights to determine the extent of replacement needed. - **Selection of Materials**: Choosing high-quality, energy-efficient skylights that meet building codes and sustainability standards. - **Installation Planning**: Scheduling installation to minimize disruption to ongoing operations within the building.

2. Refurbishing Offices and Service Amenities

The refurbishment of office spaces and service amenities is essential for improving functionality and aesthetics. Key steps include: - **Space Planning**: Redesigning office layouts to enhance workflow and collaboration. - **Upgrading Facilities**: Modernizing restrooms, break rooms, and common areas with new fixtures and finishes. - **Interior Design**: Selecting color schemes, furniture, and decor that align with the building's purpose and branding.

3. Installation of New Car Parking Facility

Creating a new car parking facility is vital for accommodating staff and visitors. This involves: - **Site Assessment**: Evaluating the available space for parking and determining the layout. - **Construction Planning**: Outlining the construction phases, including excavation, paving, and marking. - **Compliance and Safety**: Ensuring that the parking facility meets local regulations and safety standards.

4. Motorized Gates and Security Blocks

Enhancing security is a priority in building refurbishment. This includes: - **Design and Installation**: Selecting and installing motorized gates that provide controlled access to the property. - **Security Blocks**: Implementing security measures such as bollards or barriers to protect the premises. - **Integration with Security Systems**: Ensuring that new installations integrate seamlessly with existing security systems.

5. Landscaping

Landscaping plays a crucial role in enhancing the building's exterior appeal. Steps include: - **Design Planning**: Creating a landscaping plan that complements the building's architecture. - **Plant Selection**: Choosing native and low-maintenance plants to promote sustainability. - **Installation**: Executing the landscaping plan with attention to soil quality, irrigation, and maintenance.

6. Laying Interlock Over Vacant Areas

Laying interlocking pavers in vacant areas improves aesthetics and functionality. This process involves: - **Site Preparation**: Clearing and leveling the ground to ensure a stable base for the interlock. - **Design Layout**: Planning the pattern and design of the interlocking pavers for visual appeal. - **Installation**: Carefully laying the pavers to ensure durability and proper drainage.

7. New Electrical Wiring and Panel Boards

Updating electrical systems is essential for safety and efficiency. This includes: - **Electrical Assessment**: Evaluating existing wiring and panel boards for compliance with current codes. - **Installation of New Wiring**: Replacing outdated wiring with modern, energy-efficient options. - **Panel Board Upgrade**: Installing new panel boards to handle increased electrical loads and improve safety.

8. Complete Painting and Rework

A fresh coat of paint and rework can significantly enhance the building's appearance. This involves: - **Surface Preparation**: Cleaning and repairing surfaces before painting. - **Color Selection**: Choosing paint colors that align with the building's intended use and aesthetic. - **Application**: Ensuring professional application for a high-quality finish.

9. Refurbishment of Existing Sandwich Panels and Doors

Refurbishing existing sandwich panels and doors is crucial for maintaining structural integrity and aesthetics. Steps include: - **Inspection**: Assessing the condition of panels and doors for damage or wear. - **Repair or Replacement**: Deciding whether to repair or replace based on the assessment. - **Finishing Touches**: Applying finishes that match the overall design of the building.

Conclusion

Effective project management is essential for overseeing the refurbishment of an old building. By addressing each component systematically, the project can achieve its objectives while minimizing disruption and ensuring quality outcomes. Through careful planning, coordination, and execution, the refurbishment will not only enhance the building's functionality but also its overall appeal.