

ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018 Certified Company

Construction - Boundary Wall - Mar Marine Construction, UAQ
Construction of Boundary Wall
## Project Overview
The objective of this project is to successfully complete the installation of 280 linear meters (lm) of steel mesh fencing along with the incorporation of two swing gates within the boundaries of the Umm Al Quwain Free Trade Zone (UAQ FTZ). The project timeline has been set for a duration of 45 days, ensuring that all tasks are executed efficiently and effectively.
## Project Scope
The scope of the project includes several key components:
### Steel Mesh Installation
The primary focus will be on the installation of 280 linear meters of steel mesh. This type of fencing is chosen for its durability, security, and cost-effectiveness. The steel mesh will be sourced from reputable suppliers to ensure high-quality materials that can withstand the environmental conditions of the UAQ FTZ.
#### Preparation and Site Assessment
Before the installation begins, a thorough site assessment will be conducted to evaluate the terrain and any potential obstacles that may hinder the installation process. This assessment will include:
- **Soil Testing:** Understanding the soil type to determine the best foundation for the fence posts.
- **Surveying:** Marking the exact locations where the steel mesh will be installed to ensure precision and alignment.
### Swing Gates Installation
In addition to the fencing, the project will also include the installation of two swing gates. These gates will serve as access points to the fenced area, allowing for controlled entry and exit.
#### Gate Specifications
The swing gates will be designed to complement the steel mesh fencing, ensuring a cohesive appearance. Key specifications will include:
- **Material:** High-quality steel that matches the fencing.
- **Dimensions:** Sufficiently wide to accommodate vehicles, ensuring ease of access.
- **Locking Mechanism:** A secure locking system to enhance security.
### Timeline and Milestones
The entire project is set to be completed within 45 days. To ensure that the project remains on schedule, specific milestones will be established throughout the timeline, including:
- **Day 1-5:** Site preparation and material procurement.
- **Day 6-20:** Installation of the steel mesh fencing.
- **Day 21-30:** Installation of the swing gates.
- **Day 31-45:** Final inspections, adjustments, and project handover.
## Conclusion
Completing the installation of 280 linear meters of steel mesh along with two swing gates in the Umm Al Quwain Free Trade Zone is a significant undertaking that requires meticulous planning and execution. By adhering to the established timeline and focusing on quality materials and craftsmanship, the project aims to enhance security and accessibility within the designated area, ultimately contributing to the overall safety and operational efficiency of the UAQ FTZ.
Power in Numbers
Programs
Locations
Volunteers
Project Gallery












